Buildings Maintenance

Case Study - Bam Construction: Culcheth School - Door, Window and Brickwork Repairs

FM & Building Maintenance Industry Today >> 
The contractor, BAM construction, called upon Plastic Surgeon to combat the inevitable snagging in the final run up to the handover of the new school building in the North West. There was damage to a variety of internal and exterior finishes and fittings. Posted via Industry Today. Are you into it? Follow us on Twitter @IndustryToday

For more solutions please try www.hazeng.com or www.engineeringtrader.com
Pin It

This website is owned and operated by: MSL Media Limited

msl logo
www.mslmedialtd.com

Co. Number: 05359182

© 2005 MSL Media Ltd. All rights reserved. E&OE

ems logo mobile