Condition Monitoring/Predictive Maintenance - Statistics

The Hidden Cost of Ambiguity in Modern Manufacturing

by Trent McJunkin

Why Plants Fail Long Before the First Breakdown

Across the UK, maintenance, engineering, and reliability teams are fighting the same battles every day. Rising downtime. Cost pressure. Operator frustration. Maintenance teams stretched thin. New equipment that never reaches its full performance. Older assets that become harder to keep alive.

Most organisations diagnose these problems at the point of failure. They look at the breakdown, the component, the machine, or the operator. They compare what happened today with what should have happened. Then they add training, tighten procedures, or adjust preventive maintenance.

The real root cause is usually upstream.

And the real name of that root cause is ambiguity.

Ambiguity is the lack of clarity about what good looks like. It enters a project long before a technician turns a wrench or an operator starts a shift. It hides in specifications, RFQs, commissioning plans, design assumptions, and undocumented decisions. It is comfortable, silent, and easy to overlook.

Yet ambiguity is one of the largest hidden costs in UK manufacturing today.

Where Ambiguity Enters a Plant

Ambiguity rarely shows up as a dramatic mistake. It arrives quietly through normal work.

  1. Early project scoping

Teams begin with direction, not definition. Without standards and clarity, everyone involved carries a different version of success.

  1. Vendor quoting

RFQs that leave details open to interpretation guarantee variation in design, installation, and reliability. Vendors fill in the gaps based on assumptions, cost pressure, or habit.

  1. Engineering to maintenance handoff

Commissioning teams focus on throughput and deadlines. Maintenance teams need access, labeling, training, lubrication standards, and documentation. When these are vague, the plant inherits permanent reliability risks.

  1. Operations expectations

 

If operators do not know what normal looks like, abnormal hides. Early warning signals disappear.

Each step feels small and harmless, but each one creates drift that compounds over months and years.

image_29.jpeg

Ambiguity Turns Into Installed Failure Modes

When ambiguity enters the front end of a project, it always produces the same results at the back end.

Installed shortcuts.

Not because people are careless, but because they fill in missing details however they can.

Latent defects.

These hide under the surface during commissioning and early operation. Everything looks fine until the system is under load.

Chronic instability.

Breakdowns appear at the worst possible time. They look random. They are not random. Ambiguity is the quiet engineer behind most long-term reliability problems.

Four Universal Ways Ambiguity Creates Cost Across UK Manufacturing

  1. Lubrication decisions baked in at startup

Wrong viscosity for the actual operating environment, poor grease choice, incorrect relube intervals, and hard-to-reach lubrication points guarantee premature wear.

When lubrication is wrong at the design stage, technicians inherit a task that cannot be executed well. The asset starts life compromised.

  1. Automation and controls installed without reliability decisions

Robots, conveyors, palletisers, vision systems, and automated inspection equipment run flawlessly when designed with clear reliability expectations.

When they are not, small gaps in programming, guarding, routing, or sensor selection become recurring failure modes that disrupt performance months later.

  1. Compressed air systems that create moisture, wear, and waste

 

Compressed air is one of the most expensive utilities in a plant, yet ambiguity at installation turns many systems into chronic reliability risks.

  • Poor pipe pitch traps condensation
  • Missing low-point drains allows water to pool
  • Undersized or mismatched dryers allow wet air into equipment
  • Inconsistent filtration causes contamination and sticking valves
  • Incorrect header and branch sizing creates pressure drop
  • No baseline leak testing at handover locks energy waste into the system

These issues quietly erode equipment life, reduce throughput, and cause missed production targets.

4.  Electrical and instrumentation systems with undocumented variation

Missing tagging, inconsistent cable numbers, unclear cabinet layouts, instrumentation variation, and undocumented wiring changes destroy maintainability. These issues turn a simple fault into a multi-hour hunt because technicians cannot trust what they see.

When labeling is inconsistent, electricians must trace wires manually.

When cabinets are not designed to a standard, access becomes slow and hazardous. When instrumentation varies between identical assets, fault-finding becomes guesswork.

When undocumented wiring changes accumulate, every breakdown becomes a forensic investigation.

Ambiguity in electrical and control systems guarantees long troubleshooting cycles, missed production targets, and higher safety risk during fault isolation. Reliability suffers not because the equipment is complex, but because the information needed to maintain it is unclear, inconsistent, or missing.

image_9.jpeg

Why Plants Keep Missing This Problem

Manufacturing leaders are busy. Teams are stretched. Output pressure never slows down.

Because of this, organisations rely on heroics. Skilled technicians and strong supervisors keep the plant running even when the system around them drifts. That is the trap.

When people are good enough to compensate, ambiguity hides longer.

The plant believes the problem is training, staffing, or culture. In reality, the environment is built in a way that makes stability impossible. No amount of hard work can overcome a system that was never aligned in the first place.

 

What Clarity Looks Like in a Modern Plant

Clarity is not extra paperwork. It is a system that removes interpretation from work. A clarity-first organisation does five things differently.

  1. Defines success upfront

Teams align on what good looks like before work begins. Not just performance numbers, but access, maintainability, lubrication standards, failure mode expectations, and asset life assumptions.

  1. Writes RFQs with reliability in mind

Specs describe how the asset must avoid premature wear, not just how it must function. Vendors quote the same target, and hidden variation disappears.

  1. Uses commissioning as a quality gate, not a schedule milestone

Commissioning validates alignments, labeling, documentation, lubrication, torque values, guarding, access, and failure-mode prevention.

  1. Gives operators simple, visible standards

When operators know what normal looks like, they become an early warning system instead of a last line of defence.

  1. Treats maintenance as a design stakeholder

If the people who must keep the asset alive are not included early, the plant will pay for it later. This is how ambiguity is removed. This is how stability is built.

The Financial Impact Is Larger Than Most Leaders Realise

Ambiguity costs real money.

  • Increased energy waste
  • Lower throughput
  • Higher spare parts consumption
  • More unplanned downtime
  • Shorter asset life
  • Higher labour burden
  • Lower morale
  • Declining trust between departments

These are not small leaks. They compound into millions over the life of a line.

When leaders remove ambiguity, they do more than improve reliability. They restore margin, stability, and predictability.

 

A More Stable Future Begins Upstream

UK manufacturing is moving through a period of rapid change. Automation, sustainability pressure, labour constraints, and global competition demand plants that are stable, predictable, and reliable.

Plants cannot afford drift. They cannot afford assets that fight them. And they cannot afford systems built on assumptions.

The future belongs to organisations that design clarity into every stage of the value stream. Clarity protects people.

Clarity protects performance.

Clarity removes chaos before it starts.

When ambiguity is eliminated upstream, something powerful happens downstream. Reliability stops being a hope.

It becomes the natural outcome of a system built on purpose.

About the Author

Trent McJunkin is a manufacturing reliability strategist who helps organisations design clarity, stability, and long-term performance into their operations. He blends deep shop floor experience with evidence-based reliability, Lean systems, and RAMS principles to help leaders eliminate upstream ambiguity and build systems that scale. Trent advises, writes, and teaches on practical frameworks that move plants from reactive firefighting to predictable, margin-protecting performance. His work focuses on shaping the future of high-trust, high-clarity manufacturing across complex assembly and processing environments.

 