Materials Handling

13 Floor Boiler Building Lift

MHI Case Studies >> 
Milwaukee, Wisconsin (October 25, 2010) - A Pflow vertical reciprocating conveyor (VRC) was recently installed at a 13 story boiler building at a manufacturing facility in Oklahoma. The VRC replaces a 10 ton hoist mounted at the top floor of the building providing a safer lifting alternative, and easier loading and unloading at each floor.

For more solutions please try www.hazeng.com or www.engineeringtrader.com
Pin It

This website is owned and operated by: MSL Media Limited

msl logo
www.mslmedialtd.com

Co. Number: 05359182

© 2005 MSL Media Ltd. All rights reserved. E&OE

ems logo mobile