Heating and Cooling hire news
Watkins Hire Events were asked by the event organisers to supply air conditioning and heating for a high profile ball in London's Berkeley Square.
Our Global Events Director – Steve Platt worked closely with the production team to ensure the 1000 VIP guests attending the End of Summer Ball would not be too hot or too cold everything was planned and Watkins Events utilised a heat pump so whatever the weather did the guests remained comfortable.
370-kw heat pump being delivered a 6am
370-kw heat pump @ Berkeley Square
View inside the marquee
Fan coils blended into the background
20 fan coils were used to cool the marquee
View of the outside of the marquee
Watkins Hire specialise in the control of temperature, creating the right atmosphere for your event, large or small, inside or out of doors ensuring your guests are comfortable.
For more solutions please try www.hazeng.com or www.engineeringtrader.com
| < Prev | Next > |
|---|
































nsp_170.jpg)
nsp_170.jpg)

